This week is our interior plaster finished. Now you can have the house better idea of how it once.
As a surprise in the past week we have welcomed on Wednesday even the tile in our house. However, this was only because of the floor of another building owner was not yet dry. The sooner - the better. It is now possible, the finger house our house is finished faster. It changes nothing but the Einzugstermmin.
only to the outer wall, it may perhaps take a while. Because of the long winter, the plaster work is not normally begin at other builders.
Next week, tiled finish. In the same week is the blower door Test. The heating instruction takes place and the telecommunications equipment is manufactured. A small list of defects we pass the site manager to ensure that the deficiencies have been processed to the feeder. There are no major shortcomings, but if you build turnkey, everything should be the way one wishes.
Then the following week on 02.07.2010 is our wish-move-in date. In the week the house is assembled. There are doors in and the balcony railing is completed. In the bathrooms, the sinks, toilets and showers are installed.
And here are some pictures from our house:
HWR:
spray plaster times seem:
master bedroom is not tiled:
time the roof window hochgeschaut:
living room with conservatory Tiled but without joints:
comments are always welcome. By finger-house staff. : -)