Wednesday, May 26, 2010

Doctor Check Female Vedio

After 5 weeks ...

... we have electricity and running water. The heater has been going on for two weeks for the screed drying.

We also wanted to even know how warm it in the house. They were on the ground floor on the ground 42.1 °. In the DG, it was even 45 degrees. At the end of the week we go down the heating again. So that the next week can be filled.




On the next screen, the system Homeway doses can be seen. You can adapt it so what is currently needed in the room.



Homeway Center: All in good clean one box.



Our water tank for hot water and solar energy. Must only be connected yet.

Sunday, May 16, 2010

Super Bowl 12 Pack Displays

loft ready

So, we have even made this week to make the loft ready. The completion was indeed for the next week completion planned, but the sooner the better.


So it looks now under our roof:



for the attic stairs and air was allowed:



with the screws we have missed something. We needed something more screws. Overall, we have processed over 2100 bolts. This has also lasted well:



the moment we lift three times a day. The floor dries very well. We have already arrived at a starting temperature of 40 °. We no longer need to free as many times the discs from the water, we have spread all over the house cat litter. This takes the super moisture in the house.