So, we have even made this week to make the loft ready. The completion was indeed for the next week completion planned, but the sooner the better.
So it looks now under our roof:
for the attic stairs and air was allowed:
with the screws we have missed something. We needed something more screws. Overall, we have processed over 2100 bolts. This has also lasted well:
the moment we lift three times a day. The floor dries very well. We have already arrived at a starting temperature of 40 °. We no longer need to free as many times the discs from the water, we have spread all over the house cat litter. This takes the super moisture in the house.
0 comments:
Post a Comment