Saturday, May 1, 2010

Having Flat Foot How To Point

After 10 days ... Our house Contur

... our house looks like this:
















From the outside, our house is almost finished. Currently, the supply trenches are open. These are filled in week 18 with tubes. Likewise is the heating technician. In week 19 already comes the screed.

The house is missing the outer wall and the glass for the balcony railing. were

To our surprise, on 1 making May the electrician in the house to the house wiring.

We were on 1 May also not idle. Since we have opted for a loft ladder, we had to carry the boards in the loft. The boards are installed as soon as we know when the construction crew in the loft is ready.

plays back the building inspector, whether all boards reach the top. The boards are counted. There were a total of 116 rough shiplap spruce.



look how it is now in the loft of: