finger is there!
Finally we go - day 1:
We have the 16th KW took a holiday, to register callback what the first 3 days so it all happens. On Monday and Tuesday we do errands and appointments to each other. On Wednesday we went wirklichlos.
The night before the adjustment date of our house was quick to Sven to end. Around 1:30 he could not sleep. Michaela was even briefly awake, but could not fall asleep without a problem.
Sven from 1:30 then wrapped up the digital and video camera, tripod and chargers, as were never absent, of course. After the alarm rang
for Michaela, Sven has already been ready to go. Clock should arrive by 6, the assembly team. We are about set off by 5 clock had to because we remove the stones already on the site of the sealing cardboard and make the water supply.
When we turned onto our street, we have seen, it was all lit up. It took a brief monent, until we realized that it was a finger house trucks already there. It was at this time just 5:15 clock.
The construction team also came a little earlier. At 6 clock They had put their tools on the base plate and prepared everything for the first wall element. At 7:30 the first wall clock was made. At 8:40 clock all 11 wall elements of the ground floor were made. That was very impressive how quickly, accurately recorded and the installation team have done the work.
went to the inner walls of the ground floor is the ceiling panels. First, the item was placed for the winter garden. This turned out to be very difficult, as this element had no guides, to place it exactly. Now the ruler had to be stopped be to ensure that the ceiling element is positioned symmetrically. It had cost a little time and nerves. Also, the assembly team!
Now came the ceiling panels above the living room. There is then noticed that the central ceiling light with double the main I-beam could not be connected properly to the ceiling panel from the winter garden. The fault was there at the Factory House fingers. These were offset by about 4 cm. After discussion by the assembly team with finger house was found an easy solution. The double T-beams in the conservatory must be postponed cm to about 4.
had
Thus, the painstakingly taught ceiling element to be removed from the conservatory and the support can be moved. This done, the winter garden element has been aligned again. Now, the two ceiling panels bolted and the ceiling are made ready. In the attic it went
as usual. The assembly team had put only time the outer and inner walls on day 1. The roof panels could not put the lack of time man. It was already 21:00 clock. The weather was not the first Aufstelltag meant well. It was very windy and it had rained slightly irregularly. The temperatures were around 5-7 ° C.
second Tag:
On 2 Montagetag house we had our finger on the weather conditions improved. The work went on without difficulty. After the ceiling panels were in the house, we just looked at the rooms in the attic. Ua, we are a ladder to the loft went up. We decided to plan for any floor stairs, since we had not thought it would ever have enough space there. After we had seen how much space we have in the pitched floor, the decision was clear. We still need a loft ladder!
The same day, even the electricians were there. They asked us if we do not change. We then went through the plans again and have changed little things. When asked if we had no shade for the winter garden, we denied this. The electrician we pointed out that a subsequent change is very expensive. He still had good ideas to improve our planning.
parallel to the Electricians began a tour of the assembly team to build the carport. Which we have also been very pleased. Sven was not sure if the color of the right was. We have bemusternt the process of sampling the eaves in the RAL 7016. This is a dark gray color. This is the same with the window color. At the end of the 2nd
Day we celebrated the topping out yet. This is one of them. But unfortunately, less and less desired by the owner, so the installation team.
third Tag:
We had an 8 clock a meeting with our construction manager, Mr S.. Mr. S. gave us a detailed flow chart the steps in which our house will be expanded. A moving in date we have received. If everything goes normally, we can move on 02.07.2010. We then asked Mr. S. first if the small color defects to be eliminated. Finger House passes the house in the RAL colors always twice. Once a plant and once at the final assembly of the house. Then we have
told our supervisor that we do not have a floor staircase and conservatory blinds. After consultation with our specialist consultant with finger housewife A., we get a quick idea of the price additional costs. We then immediately gave an oral contract for the execution of the changes given. Once again, many thanks to Mrs. A., who informs us in a hurry as always, very good. After 4 hours we were with the site manager by appointment.
Pfeiffer The company was also on site and had a look at the statics if everything was done correctly. After a little static base rate was the structural engineer
gone again. All right.
Our roof tiles have also come. On Monday, we then covered the roof finished.
We would also like to thank the other readers of the assembly team for the great work. Sven was very surprised how quickly and cleanly is worked. Thanks to Maik, Steffen, Andre and Ulf.
We also have a few pictures. We were already angsprochen by some, when the images are seen. We were all on the ground floor 3 Monday and therefore could not fill the blog with the Contour house. We now change.
0 comments:
Post a Comment