Our district heating station is running now. The screed can come.



preparations for the screed:



A truck with anhydrite was also there on time:



The colleague at work. With the truck driver they were three.




was after about 1 1 / 2 hours even the floor in the house. We must enter the first floor, according to site manager on Friday. Then the floor is heated.




KW 20:

On Monday, the supply trenches are closed and compressed.

On Tuesday, the power connector is connected to the power column. Electrical work will be removed.

On Wednesday we will provide the loft with boards.


DSL connection:

Körle The town was until this year, very thin equipped with DSL. This will change this month. It start construction work for a fiber optic network. The community Körle has started a project to tie the community with faster DSL. All information about the project can be read on http://www.körle.de/ We can Anschuss in September, with up to 25,000 k / order bits. What we will do well :-).

Saturday, May 1, 2010

Having Flat Foot How To Point

After 10 days ... Our house Contur

... our house looks like this:
















From the outside, our house is almost finished. Currently, the supply trenches are open. These are filled in week 18 with tubes. Likewise is the heating technician. In week 19 already comes the screed.

The house is missing the outer wall and the glass for the balcony railing. were

To our surprise, on 1 making May the electrician in the house to the house wiring.

We were on 1 May also not idle. Since we have opted for a loft ladder, we had to carry the boards in the loft. The boards are installed as soon as we know when the construction crew in the loft is ready.

plays back the building inspector, whether all boards reach the top. The boards are counted. There were a total of 116 rough shiplap spruce.



look how it is now in the loft of: