We have received an invitation to the groundbreaking for the project in Körle DSL. Since we will be of course. Following there is free beer and sausages. We then also have the opportunity to see the exact process in a presentation.
In adjourn we first had 16000k/bits. We intend to increase to at least 25000k/bits and ask for an update on 50000k/bits.
Prior to this project in the community a DSL speed of up 1000k/bits possible.
Monday, May 31, 2010
Wednesday, May 26, 2010
Doctor Check Female Vedio
After 5 weeks ...
... we have electricity and running water. The heater has been going on for two weeks for the screed drying.
We also wanted to even know how warm it in the house. They were on the ground floor on the ground 42.1 °. In the DG, it was even 45 degrees. At the end of the week we go down the heating again. So that the next week can be filled.
On the next screen, the system Homeway doses can be seen. You can adapt it so what is currently needed in the room.
Homeway Center: All in good clean one box.
Our water tank for hot water and solar energy. Must only be connected yet.
Sunday, May 16, 2010
Super Bowl 12 Pack Displays
loft ready
So, we have even made this week to make the loft ready. The completion was indeed for the next week completion planned, but the sooner the better.
So it looks now under our roof:
for the attic stairs and air was allowed:
with the screws we have missed something. We needed something more screws. Overall, we have processed over 2100 bolts. This has also lasted well:
the moment we lift three times a day. The floor dries very well. We have already arrived at a starting temperature of 40 °. We no longer need to free as many times the discs from the water, we have spread all over the house cat litter. This takes the super moisture in the house.
Tuesday, May 11, 2010
Morgan Silver Dollar No Date
early 19th KW ..
preparations for the screed:
... and if the screed.
Our district heating station is running now. The screed can come.
preparations for the screed:
A truck with anhydrite was also there on time:
The colleague at work. With the truck driver they were three.
was after about 1 1 / 2 hours even the floor in the house. We must enter the first floor, according to site manager on Friday. Then the floor is heated.
KW 20:
On Monday, the supply trenches are closed and compressed.
On Tuesday, the power connector is connected to the power column. Electrical work will be removed.
On Wednesday we will provide the loft with boards.
DSL connection:
Körle The town was until this year, very thin equipped with DSL. This will change this month. It start construction work for a fiber optic network. The community Körle has started a project to tie the community with faster DSL. All information about the project can be read on http://www.körle.de/ We can Anschuss in September, with up to 25,000 k / order bits. What we will do well :-).
Saturday, May 1, 2010
Having Flat Foot How To Point
After 10 days ... Our house Contur
... our house looks like this:
... our house looks like this:
From the outside, our house is almost finished. Currently, the supply trenches are open. These are filled in week 18 with tubes. Likewise is the heating technician. In week 19 already comes the screed.
The house is missing the outer wall and the glass for the balcony railing. were
To our surprise, on 1 making May the electrician in the house to the house wiring.
We were on 1 May also not idle. Since we have opted for a loft ladder, we had to carry the boards in the loft. The boards are installed as soon as we know when the construction crew in the loft is ready.
plays back the building inspector, whether all boards reach the top. The boards are counted. There were a total of 116 rough shiplap spruce.
look how it is now in the loft of: